Federal Reserve
- All general contracting work with the complete replacement of the second floor mechanical equipment.
- The entire second floor is one large mechanical room.
- All pads were replaced or modified.
- Access was made for mechanical work in the other floors with floor penetrations through the waterproof and security systems.
- Much of the work required off hour work.
- The entire second floor is one large mechanical room.